Production Information for Directors

From sltarchive
Revision as of 11:54, 14 November 2008 by Dave Hollander (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

This article lists the major milestones of an SLT production - it can be used as a checklist, with deadlines for each task.

Much of the information here is derived from the SLT Production Handbook, but the content has now been extended and wikified for easier navigation.

Preparation

Recruit production team

Main article: Production Team

Arrange pre-production meeting

  • Arrange show poster
  • Recruit and brief Poster Designer
  • Finalise poster design
  • Arrange audition publicity
  • Place audition notices in the bar and foyer
  • Send audition information to:
  • Backstage
  • SLT web site
  • SLT discussion board
  • Choose audition pieces and place several copies in the bar

Hold Auditions

  • Cast the show and inform people who have not been cast
  • Send cast list to: Backstage, SLT web site, SLT discussion board, Notice board in the bar

Set rehearsal schedule

  • Organise space for "out" rehearsals
  • Finalise set design (and audience seating plan if in Prompt Corner)

Rehearsals

  • Decide if you will be using a prompter and recruit one if needed
  • Books Down
  • Finalise costumes
  • Finalise props and furniture
  • Finalise make-up designs
  • Finalise programme details and arrange for printing
  • Finalise lighting design
  • Finalise sound design (Music and FX)
  • Arrange assistance for set building and painting
  • Arrange for black curtains to be hung
  • (For Prompt Corner Shows) Inform box office of number of seats available
  • Organise people to do: Front of house, Raffle, Show photography

Production

Get-In

Technical Rehearsal

Dress Rehearsal

Performances

After the show

After-Show Party

Main article: Parties in the SLT Bar

Get-Out

Debriefing Meeting

See Also